Verified chamber l/r is at 15mt per min. Vented chamber and
cleaned sealing surface and belljar o-ring with ipa, pump down
chamber for 30mins, ran 10mins and leak up rate dropped to
0.7mt.
Thursday, September 20, 2012
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment