Performed after hex base and chamber floor cleaned. A tiny 'object' was found between the base and hex assembly....
Prog #4 for 5 mins. Results;
Si etch = 871A (174A/min)
PR ER = 258A/min
These are very similar results to those of 10/28/10.
Use at your own risk.
Wednesday, November 3, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment