Lowered the nitrogen pressure for the vent. Chamber leakrate is now 5 mt/ min; was 88 mt/min before adjusting press.
Tried to repair the valve but we did not have the correct size valve tip. Re-used the old tip and will order some new ones.
Tuesday, October 13, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment